Exergetic analysis & thermoeconomic analysis of Harare Power Station Buy on Amazon
Facebook LinkedIn

Exergetic analysis & thermoeconomic analysis of Harare Power Station

84.00 USD

In Stock

Book Details
Author(s) Kapfuchira, Entai
ISBN / ASIN 3659352438
ISBN-13 9783659352430
Availability In Stock
Category Paperback
Marketplace United States 🇺🇸
Description
An exergetic and thermo economic analysis of Harare Power Station, Zimbabwe was carried out. Harare Power Station is owned by Zimbabwe Power Company and has a total generating capacity of 135MW. However, its generating capacity has dropped to 20MW recently due to generating equipment breakdowns, coal shortage and the plant generating inefficiency. An energy analysis was done first. From the plant components that produced significant energy losses namely the turbine, condenser, high-pressure heater, superheaters and furnaces; the turbine followed by the condenser had the highest energy losses. The exergy analysis also detected that those components had the highest exergy destruction rates with the two furnaces destroying 82%.Harare Power Station sells its electricity to Zimbabwe Electricity and Distribution Company at $0.15/kWh. From the thermo economic analyses, Harare Power Station needs to sell its electricity at $0.56/kWh to break even. The boilers and turbine irreversibility costs reached enormous figures of $5037/h and $1024/h respectively. Recommendations were made to reduce the irreversibilities of the plant components especially in the boilers.
Donate to EbookNetworking
Previous Book Frankenstein Next Book How to Prepare for the Lsat
Previous Frankenstein
Next How to Prepare fo...