CASE STUDY: ECONOMIC VIABILITY OF COMPONENT MANAGEMENT FOR A NEW DESIGN.: An article from: Engineering Economist Buy on Amazon
Facebook LinkedIn

CASE STUDY: ECONOMIC VIABILITY OF COMPONENT MANAGEMENT FOR A NEW DESIGN.: An article from: Engineering Economist

5.95 USD

Available for download now

Book Details
ISBN / ASIN B0009FENAY
ISBN-13 978B0009FENA5
Availability Available for download now
Sales Rank #99,999,999
Marketplace United States 🇺🇸
Ratings & Reviews No reviews yet — be the first!

No reviews yet.

Description
This digital document is an article from Engineering Economist, published by Institute of Industrial Engineers, Inc. (IIE) on September 22, 2001. The length of the article is 4985 words. The page length shown above is based on a typical 300-word page. The article is delivered in HTML format and is available in your Amazon.com Digital Locker immediately after purchase. You can view it with any web browser.

Citation Details
Title: CASE STUDY: ECONOMIC VIABILITY OF COMPONENT MANAGEMENT FOR A NEW DESIGN.
Author: Sameer Kumar
Publication:Engineering Economist (Refereed)
Date: September 22, 2001
Publisher: Institute of Industrial Engineers, Inc. (IIE)
Volume: 46 Issue: 3 Page: 205

Distributed by Thomson Gale
Donate to EbookNetworking
No Prev
No Next