Dneprostroi, a dam and power plant that was one of the most monumental construction projects of the Bolsheviks' First Five-Year Plan, was a milestone in American-Soviet cooperation and the fruit of the labor of more than 60,000 workers. Little known in the West, Dneprostroi was famous in the USSR--as the largest earth dam in Europe in the 1930s, it represented the first of the giant projects so favored by Stalin. Anne Rassweiler's informative history of this project reveals new aspects of the struggle between Trotsky and Stalin, the debate on the use of foreign advisers, the importance of foreign technology, and the devastating effects of collectivization on the industrial projects of the First Five-Year Plan. Her study also provides insight into the entry of women into the industrial work force and the interaction between party leaders, party membership, and enterprise officials as they sought to realize one of the most ambitious projects in Soviet history.
The Generation of Power: The History of Dneprostroi
📄 Viewing lite version
Full site ›
Book Details
Author(s)Anne D. Rassweiler
PublisherOxford University Press
ISBN / ASIN0195051661
ISBN-139780195051667
AvailabilityIn stock. Usually ships within 2 to 3 days.
Sales Rank5,702,933
CategoryHistory
MarketplaceUnited States 🇺🇸
Description ▲
More Books in History
All the King's Men: The Truth Behind SOE's Greatest Wa…
View
India Discovered
View
Who Killed Canadian History?
View
Britain, 1815-1918: A-level (Flagship History)
View
10 Downing Street: The Illustrated History
View
Jane's F-117 Stealth Fighter: At The Controls
View
Jane's Tanks & Combat Vehicles Recognition Guide
View
PEACEKEEPER - the Road to Sarajevo
View
Freedom at Midnight
View