Search Books

ASCE 1193

Author George Robert Graham Conway
Publisher RareBooksClub.com
📄 Viewing lite version Full site ›
🌎 Shop on Amazon — choose country
22.40 USD
🛒 Buy New on Amazon 🇺🇸 🏷 Buy Used — $24.42

✓ Usually ships in 24 hours

Share:
Book Details
ISBN / ASIN123673419X
ISBN-139781236734198
AvailabilityUsually ships in 24 hours
Sales Rank99,999,999
MarketplaceUnited States 🇺🇸

Description

Excerpt: ...of Pipe. Key: cm = centimeter in = inch mm = millimeter kg = kilogram m = linear meter Pipe Diameter ThicknessWeight of PipeCost/piece fob Monterrey Lead Oakum Charcoal Total Material Cost per m cminmmkgpesosWeight kgCost pesosCost pesosCost pesospesos 10410.310911.652.00.370.0250.05253.30 15611.116315.743.70.670.06750.0654.51 30.51215.846376.507.91.440.12250.121.35 381517.468079.3610.61.940.1750.1222.30 45.71819.087190.2813.42.420.23750.137525.42 612422.21,261117.6018.83.420.3350.17533.20 763025.41,946199.0524.54.420.440.212555.77 Labor. Key: cm = centimeter, in = inch, m = meter Diameter of pipe: Width of trenchDepthCubic meters per linear meterCost of excavation per lin. mBack-filling and removing surplusTotal cost, excavation back filling etc. Hauling per linear meter Cost of laying per linear meterTotal hauling and laying per linear meterTotal excavation and laying, labor, complete cminmmPesosPesosPesosHaulingMisc.PesosPesosPesos 1040.550.900.500.600.180.780.02750.0050.060.09250.8725 1560.601.000.600.720.220.940.450.0050.8250.13251.0725 30.5120.651.200.780.940.291.230.180.00750.14750.3351.565 38150.701.300.911.100.341.440.27250.010.190.47751.9125 45.7180.801.401.121.340.411.750.27250.010.2450.52752.2775 61241.001.501.501.800.552.350.8250.080.411.3153.665 76301.101.601.762.110.652.760.830.100.531.464.22 Note.