Search Books
Nanostructured Materials, S… Welding Metallurgy

Evaluating Contract Claims

Author R. Peter Davison, John Mullen
Publisher Wiley-Blackwell
Category Technology & Engineering
📄 Viewing lite version Full site ›
🌎 Shop on Amazon — choose country
100.53 150.00 USD
🛒 Buy New on Amazon 🇺🇸 🏷 Buy Used — $122.05

✓ Usually ships in 1 to 4 weeks

Share:
Book Details
ISBN / ASIN1405159200
ISBN-139781405159203
AvailabilityUsually ships in 1 to 4 weeks
Sales Rank1,768,564
MarketplaceUnited States 🇺🇸

Description

Most medium to large construction contracts include a claim for extra payment for variations or disruption to the programme. Whilst the causes of the claim are often well documented, what can and cannot be included in the payment is often misunderstood and the calculation of quantum consequently becomes vague and poorly substantiated.

Thoroughly updated over the previous edition, reflecting pertinent Court decisions on damages and the duty to mitigate, the new edition covers new provisions of the revised JCT 2005 contracts and the 2005 New Engineering Contract. There is substantial additional material on issues arising from time and delay analysis and the financial consequences of changes to time – issues that regularly cause real problems in the evaluation of quantum for construction claims.

Most current books on the subject concentrate on the establishment of liability and the requirements of individual standard forms of contract. This book, however, concentrates on the quantification of claims after liability has been established, regardless of the form of contract used, and sets out the principles and methods that should be reflected in the evaluation of claim quantum and the standard of substantiation required. It will therefore appeal to those working with both building and engineering contracts.

Reviews of the previous edition

"Well written and highly informative" Building Engineer

“His observations on the assessment of productivity and the use of facilities and equipment are particularly helpful for lawyers, who deal with construction claims” Construction Law

Fourth Dimension in Building: Strategies for Avoiding …
View
Design and Evaluation of Rigid and Flexible Pavements,…
View
Nuclear Nonproliferation: Status Of U.s. Efforts To Im…
View
Time-Domain Numerical Methods for Modelling Antennas, …
View
The Rise of the Standard Model: A History of Particle …
View
Synthesis, Properties and Crystal Chemistry of Perovsk…
View
Error Propagation in Environmental Modelling with GIS …
View
Crops And Environmental Change: An Introduction To Eff…
View
Multicarrier Modulation with Low PAR: Applications to …
View