NASA Project Gemini Familiarization Manual Manned Satellite Spacecraft
📄 Viewing lite version
Full site ›
⌛ 🇫🇷 France pricing being fetched…
Prices will appear once fetched — usually within a few minutes.
View in:
🇺🇸 USA
Book Details
Author(s)NASA
PublisherPeriscope Film LLC
ISBN / ASIN1935700693
ISBN-139781935700692
CategoryTechnology & Engineering
MarketplaceFrance 🇫🇷
Description ▲
Just ten days after Alan Shepard Jr. became America's first man in space on May 5, 1961, President John F. Kennedy challenged the nation, suggesting that the United States should land a man on the moon by the end of the decade. The ambitious goal of Project Apollo required a series of intermediate steps, which were to be explored by Project Gemini. Created on January 3, 1962, Project Gemini's objectives were many. During ten manned flights in 1965 and 1966, astronauts would perform spacewalks, rendezvous with orbiting vehicles using maneuvering and propulsion systems, and perform docking tests. A great deal of experience was gained and equipment tested, and with one exception - a dry land capsule landing - all of the planned objectives were met. All ten manned flights were made using Titan II two-stage boosters that were purpose-built for Gemini and known as "GLV" or Gemini-Titans. The prime contractor for the Mercury capsule McDonnell Aircraft, constructed the two-man Gemini capsule. A larger, more sophisticated spacecraft than Mercury, the Gemini capsule relied on a detachable Equipment Module for power, propulsion, and life-support systems. The capsule itself was outfitted with ejection seats, carried an on-board Guidance Computer, and could be flown in six directions. Created by NASA and contractor McDonnell Aircraft, this Familiarization Manual explains all the systems aboard the Mercury space capsule including cabin controls, sequence, electrical power, cooling, guidance and control, communications, retrograde rocket, and landing systems and procedures. Dating from September of 1965 for the long range and extended missions, it represents a late revision of documents created at the beginning of the Gemini program. Originally restricted, this manual has been declassified and is presented in its entirety, running nearly 600 pages.
More Books in Technology & Engineering
Fourth Dimension in Building: Strategies for Avoiding …
View
Design and Evaluation of Rigid and Flexible Pavements,…
View
Nuclear Nonproliferation: Status Of U.s. Efforts To Im…
View
Time-Domain Numerical Methods for Modelling Antennas, …
View
The Rise of the Standard Model: A History of Particle …
View
Synthesis, Properties and Crystal Chemistry of Perovsk…
View
Error Propagation in Environmental Modelling with GIS …
View
Crops And Environmental Change: An Introduction To Eff…
View
Multicarrier Modulation with Low PAR: Applications to …
View