The design work on the new carrier commenced as early as 1937 and the initial design was unveiled on 27 November and received the number “02”. On 21 July 1938 corrections were done to the design and it was approved.
The ship of displacement of 27.800 tons was ordered. It was included into Navy development program, approved on 8 December 1938. After the acceptance of the main specifications of the carrier work on the detailed design could be commenced (the work began in December 1939). Due to several delays the ship was laid down as late as 10 July 1941 at Kawasaki shipyard in Kobe. Until 5 March 1943, when the ship was named, she was known as the hull number 130.
The official christening took place before launching on 7 April 1943. The ship was named TAIHO (Great Phoenix).
On 3 February 1944 the ship was towed to the Navy Shipyard in Kure for further equipping. On 7 March 1944 the ship was commissioned and entered service.
The Japanese Aircraft Carrier Taiho (Super Drawings in 3D)
📄 Viewing lite version
Full site ›
28.95
USD
🛒 Buy New on Amazon 🇺🇸
Book Details
Author(s)Waldemar Góralski
PublisherKagero
ISBN / ASIN8364596756
ISBN-139788364596759
Sales Rank2,106,464
CategoryPaperback
MarketplaceUnited States 🇺🇸
Description ▲
More Books in Paperback
Nightmare Hour TV Tie-in Edition
View
First Light
View
The Miles Between
View
Prize Stories 1990: The O. Henry Awards (Pen / O. Henr…
View
Democracy Begins Between Two
View
The Model Locomotive Engineer, Fireman, and Engine Boy
View
Bloodline in the Sand
View
Making America, Volume A, Brief, 2nd Ed + Perfect Unio…
View
Ellis, Becoming a Master Student, 11th Edition Plus My…
View