Search Books

Capacity-constrained reorder intervals for materials requirements planning systems.: An article from: IIE Transactions

Author Arthur V. Hill, Amithabh S. Raturi, Chee-Chuong Sum
Publisher Institute of Industrial Engineers, Inc. (IIE)
📄 Viewing lite version Full site ›
🌎 Shop on Amazon — choose country
5.95 USD
🛒 Buy New on Amazon 🇺🇸

✓ Available for download now

Share:
Book Details
ISBN / ASINB00097U1LW
ISBN-13978B00097U1L7
AvailabilityAvailable for download now
MarketplaceUnited States 🇺🇸

Description

This digital document is an article from IIE Transactions, published by Institute of Industrial Engineers, Inc. (IIE) on November 1, 1997. The length of the article is 8884 words. The page length shown above is based on a typical 300-word page. The article is delivered in HTML format and is available in your Amazon.com Digital Locker immediately after purchase. You can view it with any web browser.

Citation Details
Title: Capacity-constrained reorder intervals for materials requirements planning systems.
Author: Arthur V. Hill
Publication:IIE Transactions (Refereed)
Date: November 1, 1997
Publisher: Institute of Industrial Engineers, Inc. (IIE)
Volume: v29 Issue: n11 Page: p951(13)

Distributed by Thomson Gale