Search Books

Optimal reserve management for restructured power generating systems [An article from: Reliability Engineering and System Safety]

Author Y. Ding, P. Wang, A. Lisnianski
Publisher Elsevier
📄 Viewing lite version Full site ›
🌎 Shop on Amazon — choose country
7.95 USD
🛒 Buy New on Amazon 🇺🇸

✓ Available for download now

Share:
Book Details
PublisherElsevier
ISBN / ASINB000RR9QRE
ISBN-13978B000RR9QR5
AvailabilityAvailable for download now
MarketplaceUnited States 🇺🇸

Description

This digital document is a journal article from Reliability Engineering and System Safety, published by Elsevier in 2006. The article is delivered in HTML format and is available in your Amazon.com Media Library immediately after purchase. You can view it with any web browser.

Description:
This paper presents a technique to determine the optimal reserve structure (reserve providers and the corresponding reserve capacity) for a restructured power generating system (GS). The reserve of a GS can be provided by its own generating units and can also be purchased from other GSs through the reserve agreements. The objective of reserve management for a GS is to minimize its total reserve cost while satisfying the reliability requirement. The reserve management is a complex optimization problem, which requires a large amount of calculations. In order to simplify the evaluation, a complex generating system (CGS) consisting of different GSs and the corresponding transmitting network is represented by its multi-state reliability equivalents. The universal generating functions (UGFs) of these equivalents are developed and the special operators for these UGFs are defined to evaluate the reliability of a particular GS, which has reserve agreements with other GSs in the CGS. The genetic algorithm (GA) has been used to solve the optimization problem. An improved power system-IEEE reliability test system is used to illustrate the technique.