Building Response to Tunnelling: Case studies from Construction of the Jubilee Line Extension, London (2 volumes) Buy on Amazon
Facebook LinkedIn

Building Response to Tunnelling: Case studies from Construction of the Jubilee Line Extension, London (2 volumes)

159.55 290.00 -45% USD

In stock. Usually ships within 2 to 3 days.

Book Details
ISBN / ASIN 0727730177
ISBN-13 9780727730176
Availability In stock. Usually ships within 2 to 3 days.
Sales Rank #6,923,057
Marketplace United States 🇺🇸
Ratings & Reviews No reviews yet — be the first!

No reviews yet.

Description
The ability to predict the potential damage to buildings accurately and to have confidence in the chosen protective measures is of increasing importance for the viability of urban tunnelling.

The Jubilee Line Extension Project (JLEP) presented a unique opportunity to capture reliable field measurements of the effects of tunnelling on a wide range of buildings. Building response to tunnelling: Case studies from the Jubilee Line Extension, London is the result of this work.

Donate to EbookNetworking
No Prev
No Next