MRP II: should its simplicity remain unchanged? (Material Requirements Planning system): An article from: Industrial Management Buy on Amazon

https://www.ebooknetworking.net/books_detail-B00096NCK0.html

MRP II: should its simplicity remain unchanged? (Material Requirements Planning system): An article from: Industrial Management

5.95 USD
Buy New on Amazon 🇺🇸

Available for download now

Book Details

ISBN / ASINB00096NCK0
ISBN-13978B00096NCK9
AvailabilityAvailable for download now
MarketplaceUnited States  🇺🇸

Description

This digital document is an article from Industrial Management, published by Institute of Industrial Engineers, Inc. (IIE) on May 1, 1996. The length of the article is 1693 words. The page length shown above is based on a typical 300-word page. The article is delivered in HTML format and is available in your Amazon.com Digital Locker immediately after purchase. You can view it with any web browser.

From the supplier: Third generation Material Requirement Planning (MRP II) systems can be upgraded by utilizing third-party software and scheduler. MRP II system is being replaced by alternative material planning software due to its limited sizing and scheduling functions which result in inefficient plans. MRP II can be utilized to support an integrated planning system to accommodate scheduling and sequencing algorithms. Materials planning and control functions can be incorporated to eliminate the need for third party software.

Citation Details
Title: MRP II: should its simplicity remain unchanged? (Material Requirements Planning system)
Author: M. Ahsan A. Hasin
Publication:Industrial Management (Magazine/Journal)
Date: May 1, 1996
Publisher: Institute of Industrial Engineers, Inc. (IIE)
Volume: v38 Issue: n3 Page: p19(2)

Distributed by Thomson Gale
Donate to EbookNetworking
Prev
Next