Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns [An article from: European Journal of Operational Research] Buy on Amazon

https://www.ebooknetworking.net/books_detail-B000PDT0RG.html

Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns [An article from: European Journal of Operational Research]

Book Details

PublisherElsevier
ISBN / ASINB000PDT0RG
ISBN-13978B000PDT0R2
MarketplaceCanada  🇨🇦

Description

This digital document is a journal article from European Journal of Operational Research, published by Elsevier in 2007. The article is delivered in HTML format and is available in your Amazon.com Media Library immediately after purchase. You can view it with any web browser.

Description:
This paper is concerned with determination of optimal run time for an economic production quantity (EPQ) model with scrap, rework, and stochastic machine breakdowns. In real life manufacturing systems, generation of defective items and random breakdown of production equipment are inevitable. In this study, a portion of the defective items is considered to be scrap, while the other is assumed to be repairable. Total production-inventory cost functions are derived respectively for both EPQ models with breakdown (no-resumption policy is adopted) and without breakdown taking place. These cost functions are integrated and the renewal reward theorem is used to cope with the variable cycle length. Theorems on conditional convexity of the integrated overall costs and bounds of the production run time are proposed and proved. We conclude that the optimal run time falls within the range of bounds and it can be pinpointed by the use of the bisection method based on the intermediate value theorem. Numerical example is provided to demonstrate its practical usages.
Donate to EbookNetworking
Prev
Next