A robust optimization model for multi-site production planning problem in an uncertain environment [An article from: European Journal of Operational Research]
Book Details
PublisherElsevier
ISBN / ASINB000PDTVR0
ISBN-13978B000PDTVR2
AvailabilityAvailable for download now
Sales Rank8,943,607
MarketplaceUnited States 🇺🇸
Description
This digital document is a journal article from European Journal of Operational Research, published by Elsevier in 2007. The article is delivered in HTML format and is available in your Amazon.com Media Library immediately after purchase. You can view it with any web browser.
Description:
This paper addresses the multi-site production planning problem for a multinational lingerie company in Hong Kong subject to production import/export quotas imposed by regulatory requirements of different nations, the use of manufacturing factories/locations with regard to customers' preferences, as well as production capacity, workforce level, storage space and resource conditions at the factories. In this paper, a robust optimization model is developed to solve multi-site production planning problem with uncertainty data, in which the total costs consisting of production cost, labor cost, inventory cost, and workforce changing cost are minimized. By adjusting penalty parameters, production management can determine an optimal medium-term production strategy including the production loading plan and workforce level while considering different economic growth scenarios. The robustness and effectiveness of the developed model are demonstrated by numerical results. The trade-off between solution robustness and model robustness is also analyzed.
Description:
This paper addresses the multi-site production planning problem for a multinational lingerie company in Hong Kong subject to production import/export quotas imposed by regulatory requirements of different nations, the use of manufacturing factories/locations with regard to customers' preferences, as well as production capacity, workforce level, storage space and resource conditions at the factories. In this paper, a robust optimization model is developed to solve multi-site production planning problem with uncertainty data, in which the total costs consisting of production cost, labor cost, inventory cost, and workforce changing cost are minimized. By adjusting penalty parameters, production management can determine an optimal medium-term production strategy including the production loading plan and workforce level while considering different economic growth scenarios. The robustness and effectiveness of the developed model are demonstrated by numerical results. The trade-off between solution robustness and model robustness is also analyzed.
