Modified braced wall system with pre-stressed wale for excavation in urban areas [An article from: Building and Environment] Buy on Amazon
Facebook LinkedIn

Modified braced wall system with pre-stressed wale for excavation in urban areas [An article from: Building and Environment]

Price not available for India

You can still browse on Amazon. Try another country above.

Book Details
Publisher Elsevier
ISBN / ASIN B000RR5PJM
ISBN-13 978B000RR5PJ7
Marketplace India 🇮🇳
Ratings & Reviews No reviews yet — be the first!

No reviews yet.

Description
This digital document is a journal article from Building and Environment, published by Elsevier in . The article is delivered in HTML format and is available in your Amazon.com Media Library immediately after purchase. You can view it with any web browser.

Description:
Excavation works in soft clay require the installation of a retaining wall together with a means of holding the retaining structure in position. However, the traditional braced wall system (TBWS) used for that purpose unfortunately narrows the spacing between struts during excavation works. To address the issue, this paper introduces the modified braced wall system (MBWS) for widening the horizontal intervals between struts. Case studies were performed to validate the MBWS by comparing its costs, schedules, constructability, and safety to those of the TBWS. The results showed that the MBWS was more effective than the TBWS.
Donate to EbookNetworking
No Prev
No Next