CCLEP reduces energy consumption by more than 50% for a luxury shopping mall.(Continuous Commissioning Leading Project)(Report): An article from: ASHRAE Transactions
Book Details
ISBN / ASINB00371OVK4
ISBN-13978B00371OVK7
AvailabilityAvailable for download now
MarketplaceUnited States 🇺🇸
Description
This digital document is an article from ASHRAE Transactions, published by American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc. on July 1, 2009. The length of the article is 4876 words. The page length shown above is based on a typical 300-word page. The article is delivered in HTML format and is available immediately after purchase. You can view it with any web browser.
From the author: The Continuous Commissioning Leading Project (CCLEP) process is an ongoing process to apply system optimization theory and advanced technologies in commercial retrofit projects. The CCLEP process was applied to a luxury shopping mall and office building. The case study building has ten single fan dual-duct VAV AHUs, 123 dual-duct pneumatic controlled pressure independent terminal boxes, and a central heating and cooling plant. Major retrofit efforts include upgrading pneumatic to DDC controls for all AHUs, installing main hot deck dampers, replacing the boiler, installing VFD on fans and pumps, and installing Fan Airflow Stations (FAS) and Pump Waterflow Stations (PWS). This paper presents the optimal control strategies, which include main hot deck damper control, supply fan control integrated with FAS, return fan control, optimal control for terminal boxes, chilled water temperature and chilled water pump speed control, hot water temperature and hot water pump speed control. Boiler size was optimized at the time of replacement while the performance was measured and verified. The measured hourly utility data after CCLEP show that annual HVAC electricity consumption is reduced by 56% and gas use is reduced by 36%.
Citation Details
Title: CCLEP reduces energy consumption by more than 50% for a luxury shopping mall.(Continuous Commissioning Leading Project)(Report)
Author: L. Wu
Publication:ASHRAE Transactions (Magazine/Journal)
Date: July 1, 2009
Publisher: American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc.
Volume: 115 Issue: 2 Page: 492(10)
Article Type: Report
Distributed by Gale, a part of Cengage Learning
From the author: The Continuous Commissioning Leading Project (CCLEP) process is an ongoing process to apply system optimization theory and advanced technologies in commercial retrofit projects. The CCLEP process was applied to a luxury shopping mall and office building. The case study building has ten single fan dual-duct VAV AHUs, 123 dual-duct pneumatic controlled pressure independent terminal boxes, and a central heating and cooling plant. Major retrofit efforts include upgrading pneumatic to DDC controls for all AHUs, installing main hot deck dampers, replacing the boiler, installing VFD on fans and pumps, and installing Fan Airflow Stations (FAS) and Pump Waterflow Stations (PWS). This paper presents the optimal control strategies, which include main hot deck damper control, supply fan control integrated with FAS, return fan control, optimal control for terminal boxes, chilled water temperature and chilled water pump speed control, hot water temperature and hot water pump speed control. Boiler size was optimized at the time of replacement while the performance was measured and verified. The measured hourly utility data after CCLEP show that annual HVAC electricity consumption is reduced by 56% and gas use is reduced by 36%.
Citation Details
Title: CCLEP reduces energy consumption by more than 50% for a luxury shopping mall.(Continuous Commissioning Leading Project)(Report)
Author: L. Wu
Publication:ASHRAE Transactions (Magazine/Journal)
Date: July 1, 2009
Publisher: American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc.
Volume: 115 Issue: 2 Page: 492(10)
Article Type: Report
Distributed by Gale, a part of Cengage Learning