In recent years, the engineer troops have shortened significantly the time needed for replacing floating bridges with low-level bridges by mechanizing the process of constructing them from components prepared beforehand. The great majority of units of engineer troops construct low-level bridges at the rate of 20 linear meters an hour while working from one bank, and from 30 to 35 linear meters while working from two banks