Biogas Plant Construction Manual Fixed-dome Deenbandhu model digester: 2 to 6 cubic meter biogas generation per day [ Loose Leaf Publication]
Description
TOC  1. Introduction ..  5  2. Selection of Construction Materials..  6  2.1 Cement .. 6 2.2 Sand . 6 2.3 Stone Aggregates  .. 7 2.4 A pipe to connect the digester and the inlet tank  . 8 2.5 Brackets welded galvanized iron pipe  . 8 2.6 Valve to control the gas flow  .. 8 2.7 Bricks  . 8 2.8 High Density Poly Ethylene Pipe (HDPE) pipe . 9 2.9 Rubber Hose  . 9 2.10 Brass Nipple  .. 9 2.11 Biogas Burner .. 9 2.12 Water . 9 3. Determining Plant Size ..  10 4. Construction Site Selection.. 10 5. Plan layout for excavation of pit . 11  6. Excavation of pit for plant installation .. 11 7. Casting the bed concrete .. 13 8. Construction of centre pillar . 13 9. Guide pole . 14 10. Fixing first layer of bricks .. 14 11. Starting construction of the digester .. 15 12. Placing of inlet pipe . 15 13. Plastering the outside of the partly constructed digester . 16 14. Laying of brick layer as top of the digester slurry flow door... more LOOSE LEAF UNBOUND EDITION NO BINDER.